Ashley Sling,alloy chain slings
home About Ashley Sling alloy chain sling inspection Contact Site Map
ALLOY CHAIN SLINGS, WIRE ROPE SLINGS , RIGGING
HARDWARE, FALL PROTECTION, HOISTS and more . . .
arrow
 Alloy Chain Slings
arrow Grab IQ Alloy Chain Slings
arrow Wire Rope Slings
arrow Nylon Web Slings
arrow Polyester Round Slings
arrow High Performance Round Slings
arrow Wire Mesh Slings
arrow TUFF-ASH ® Sling Protection Products
arrow Linton Magnetic Sling Protectors
arrow Crosby Rigging Hardware
arrow Wire Rope
arrow Samson Synthetic Rope
arrow Hoists
arrow Fall Protection
arrow Fall Protection for Tools
arrow Netting Systems
arrow Tie Down Equipment
arrow Plate Clamps
arrow Lifting Beams
arrow Load Testing Equipment
arrow Lifting Magnets
arrow Training Seminars
arrow OSHA Regulations & Guidelines
arrow Klein Iron Workers Tools
arrow Safety Products

HIGH CAPACITY END CAP SPREADER BEAM (Model HC-BEF)
<Back Next>
  The same end fittings that build our high capacity spreader beams are available as end fittings only. This allows you to stock one or several sizes of end fittings; work with a local steel supplier to provide cut to length schedule 80 pipe; drill accordingly; and add the required top rigging. Now you can respond to your customers needs with a quickly built, ASME compliant spreader beam.
adjustable spreader beam
PRODUCT FEATURES:
• Build your own spreader beam.
• Fittings only are available in
  2-3 business days.
• Pivoting lower lugs allow for
  75ᴼ to 90ᴼ lower rigging angle.
• Complies with ASME standards when   assembled to specifications using   designated pipe and rigging.
   
  end cap
 
ASSEMBLY INFORMATION

 
The Model HC-BEF is designed to use A53 Grade B, schedule 80 pipe as the central structural element between the end fittings. This structural material is readily available at most steel service centers. See the above chart for the nominal A53 Grade B, schedule 80 pipe size required.

Other requirements are:

• The length of pipe used for this central element must be straight within 1/4" end to end.
• The pipe should have the ends cleanly cut square with its center line.
• The A53 Grade B, schedule 40 pipe should not have any weld joint irregularities.
• Each end of the A53 Grade B, schedule 40 pipe must have the correct diameter holes drilled through both
   walls and both ends must be in line.
• The A53 Grade B, schedule 40 pipe used in this application does not need to pass any pres-sure testing.

Assembly pins are provided with the end fittings. The pins provided are only to be used to fasten the High Capacity Beam End Fitting (HC-BEF) to the properly sized A53 Grade B, schedule 80 pipe.

NOTE: Complete assembly instructions are provided with each set of end fittings.

 

  spacer
Atlanta, GA
404-691-2604
Slings Atlanta, GA
Charlotte, NC
704-347-0071
Slings Charlotte NC
Chattanooga, TN
423-867-9380
Slings Chattanooga
Columbus, MS
662-328-4040
Slings, Columbus
Knoxville, TN
865-675-1225
Slings Knoxville, TN
Nashville, TN
615-259-5121
Sling Nashville, TN